As you can see, we're in the process of renovating the hotel's Crystal Ballroom. Built over 80 years ago as an addition to the original structure, it was in need of some TLC and updating.

In this renovation we took down the ceiling to repair the plumbing and electrical system above. This will result in a brand new ceiling for the ballroom.
Although the ballroom and hotel offers breathtaking views of the lake and guests can enjoy its breezes, those utilizing this space will now have the option of air conditioning. In order to conserve energy, the room is also being insulated. We drilled holes in the plaster about every 16 or so inches in order to "blow in" the insulation. So far, we've used a total of 360 bags! (Don't worry, we'll patch the holes when we're finished!)
Check back for more updates!